- Bushing is more than specified (should not project more than 4 cm on exposed face and 1 cm on the face to be plastered).
- Stones not wetted before use.
- Mortar not mixed with mechical mixer.
- Proper bond between two connected walls not provided.
- Stones with round surface not to be used.
- Stones not tested for water absorption.
- Sand used has more silt content or contains harmful sulphates/ chemicals, fineness modulus not checked.
Labels
- Design of Concrete Structures
- Midas Civil
- Staadpro
- General
- Bridge Engineering
- Earthquake Engineering
- Latest news
- Photos
- Specifications
- Indian Standard codes
- Interior Designing
- Discussions
- GIS
- Tower
- Drawings
- Roads
- Staircase
- Batching
- Concrete
- Concrete Batching Plant
- Enviornment
- Excel
- Job
- Planning and management Softwares
- Plant
- Post Disaster Shelter
- Quality Control
- Railway
- Rehabilitation
- Skyscraper
- Soil
- Travel
- structure analysis
- water content