- Bushing is more than specified (should not project more than 4 cm on exposed face and 1 cm on the face to be plastered).
- Stones not wetted before use.
- Mortar not mixed with mechical mixer.
- Proper bond between two connected walls not provided.
- Stones with round surface not to be used.
- Stones not tested for water absorption.
- Sand used has more silt content or contains harmful sulphates/ chemicals, fineness modulus not checked.
Labels
Design of Concrete Structures
(86)
Midas Civil
(43)
Staadpro
(32)
General
(30)
Bridge Engineering
(29)
Earthquake Engineering
(25)
Latest news
(16)
Photos
(15)
Specifications
(11)
Indian Standard codes
(10)
Discussions
(6)
GIS
(4)
Tower
(3)
Drawings
(2)
Roads
(2)
jobs
(2)
Batching
(1)
Concrete
(1)
Concrete Batching Plant
(1)
Enviornment
(1)
Planning and management Softwares
(1)
Plant
(1)
Post Disaster Shelter
(1)
Quality Control
(1)
Railway
(1)
Rehabilitation
(1)
skyscrape
(1)